Description
Disassembly of the existing pavement and sub-pavement. Production of a galvanized reinforcement frame made of square steel tubes 25 x 25 x 3 mm with reinforcement ribs against bending. Installation of the frame by welding it on as a support for a granite slab. Installation of a new 50 mm thick granite slab with rounded edges, surface and sides polished. Including disposal of the old material.