As part of the renovation of the playground, the municipality of Morschwiller-le-Bas wanted to add a concrete skate park. Vertical developed the design and concept with local skaters in workshop mode. After the tendering phase, the work was awarded to the construction company Albizzati. In the role of site manager, Vertical supervised the work and monitored it on a weekly basis.
The skate park consists of a green core with plants and concrete surfaces on different levels that run all around. A hip quarterpipe and a hip bank with parking block serve as starting elements. In between are curbs, a rail, a speed bump with rainbow rail and two stair sets with hubba. The adjacent playground includes many elements for children and a sports area.
We would like to thank the town of Morschwiller-le-Bas for the trust they have placed in us. In particular, we would like to thank the landscape architects LAP’s for the pleasant cooperation!
Address
Rue du Moulin
F-68790 Morschwiller-le-Bas (near the sports center)
https://www.facebook.com/morschwillerlebas/